To a flipper, drywall is the first step. They just want to hide the problems that are inside the walls. But we’ve done years of preparation, with patience, permits, and inspections. Drywall is one of the last steps, and it is so satisfying to know that we’ve done everything to code and with craftsmanship. It’s also pretty fun that mold-resistant drywall is purple!
The drywall crew went so fast that they did the entire basement in two days. Because they were reckless, they destroyed a light switch and a smoke detector. I’ll be subtracting those costs from their fee. Everything else looks pretty good.