Amáda and I continue the electrical rough-in for the basement. Inspection is in just 2 days, so we have to hurry.
I finish the bathroom junction boxes and wiring from the back side.
Amáda and I continue the electrical rough-in for the basement. Inspection is in just 2 days, so we have to hurry.
I finish the bathroom junction boxes and wiring from the back side.