I continue insulating the basement, focusing on the rim joist. This area is hard to see and difficult to insulate between each joist, but is so badly needed. I get some help from Harry who carefully measures and cuts each foamboard piece. Meanwhile, the old screws in the joists are being removed by our foreign exchange student, Pascal.