Amáda doesn’t skip steps. She applies a second coat of primer to all of the walls. Next up: 2 coats of moisture-resistant paint on the ceiling.

Meanwhile, I start preparation work for a TV mount and cable tunnel.
Amáda chose “Agreeable Beige” for the walls. The first coat of paint went in the laundry room today!
We also had to prepare for the flooring installation by moving everything off of the floor. This included the bathroom vanity, washer, dryer, a refrigerator, and more. Somehow, we squeezed them into the only place available: the bathroom.
We chose a wood grain vinyl flooring product that is suitable for basements. It gets glued directly to the concrete. An installation team arrives and gets started.
The vinyl flooring installers finished their work today. The wood grain looks great! They also carpeted the stairs.
Amáda carefully applies a second coat of paint to the laundry room walls.
I start cutting trim for the laundry room. Amáda starts the second coat of primer in the bathroom.
Amáda finishes the second coat of moisture-resistant paint on the bathroom ceiling. I finish painting the laundry room baseboards.
I install the bathroom ceiling light, bath fan, and heat lamp. Meanwhile, Amáda adds the first coat of moisture-resistant paint to the bathroom walls.